After I put in the sprinkler system I will need to re-sod:
Preparation [1]:
- choose the right type of grass
- measure the area to be covered
- smooth and level area to be covered; use a roller
- remove all pebbles, sticks and debris
- Loosen top layer of soil or spread new top soil to about 1/2 to 1 inch deep
- Spread out dolomite lime at a quantity of 50 lbs per 500 sq ft.
- spread out starter fertilizer
- rake lawn lightly to work the lime and fertilizer into the top soil
Laying sod
- lay sod immediately before it heats up
- moisten the area immediately before laying sod (never lay on dry ground)
- start laying out sod along a straight edge; stagger so short edges don’t line up
- Hand tamp sod edges
- use a serrated knife to cut around edges
After laying sod
- when all sod laid, soak it down well and rollout with a lawn roller
- avoid walking on the newly laid sod for three to four weeks
Leave a Reply