Tag: Solar Project

  • Approval

    in:
    Approval

    We are moving forward to the next step to implement solar panels on our roof.  To proceed under  the MicroFit program two levels of approval are required. First from the IESO (the Independent Electricity System Operator) and second from the LDC (Local Distribution Company, which in my case is Power Stream). The purpose of the…

  • Passing Wind

    in: ,
    Passing Wind

    39 years ago I began the process of building a log cabin on a piece of property I owned in the Eastern Townships just outside Montreal.  The first step was to receive the logs, peal them of their bark, and then let them dry.  The following year I built the cabin.   At that time…